Heat Network Energy Centres – Could Flexibility Improve the Economics?
Key information
Posted: 7th October 2026
Company Name: Enel X
Contact Name: Ian Capper
Contact Email: ian.capper@enel.com
Telephone: 07769389788
Expires: 31st October 2027
Details
As heat networks evolve, we’re keen to collaborate with organisations across the sector to explore whether flexibility can support the economics, design and long-term viability of low-carbon heat schemes.
We’re interested in connecting with developers, asset owners, operators, O&M providers, consultants, investors, funders, technology providers and equipment manufacturers to share experience, compare approaches and explore where flexibility could add value.
Why does this matter?
As energy centres adopt larger heat pumps, electric boilers and thermal storage, they can become significant electricity consumers.
With the right controls, storage and operating strategy, some of this electrical demand may be able to respond to market conditions while continuing to meet the underlying requirement for reliable heat.
This could potentially:
Strengthen investment and funding cases
Reduce energy and operating costs
Create additional revenue opportunities
Improve asset utilisation
Support the business case for electrification
Influence plant selection, controls and thermal storage
Improve the long-term commercial performance of schemes
We’d particularly like to hear from:
Developers and funders – could flexibility improve the economics or investment case for a scheme?
Designers and consultants – should flexibility be considered alongside plant selection, controls and thermal storage from the outset?
Operators and O&M providers – can existing assets provide flexibility without compromising heat delivery or operational priorities?
Manufacturers and technology providers – could flexibility capability form part of the specification for future heat network assets?
We’re particularly interested in larger flexible electrical output loads, typically around 1 MW or above, including:
Large heat pumps and electric boilers
CHP and hybrid energy systems
Thermal storage
Battery Energy Storage Systems
Depending on the assets and operating requirements, we’re exploring opportunities across Capacity Market, Balancing Mechanism, wholesale optimisation and frequency response, alongside opportunities to reduce electricity costs through smarter operation.
Over the last six months, Enel X has contracted more than 26 MW of heat pump and CHP flexibility across the district heating sector. This is giving us a growing insight into how flexibility can work alongside plant selection, controls, thermal storage and day-to-day heat network operation.
A significant amount of work is already underway to reduce the cost of low-carbon heat. We believe it is worth exploring whether flexibility should be considered as part of that solution, not simply as an additional revenue stream, but as something that could influence how schemes are designed, funded and operated.
If you’re developing, funding, designing, operating, maintaining or supplying heat network projects, we’d welcome the opportunity to share experience, discuss live or planned schemes and explore where flexibility could add value.
If this is an area you’re looking at, we’d be very interested to hear from you.
Categories
- Consultancy
- Consumer group
- DBOM
- Developer
- Equipment Suppliers
- Industry Association Installation
- Operation and Maintenance
- Investor
- Other
Heat Network Exchange Disclaimer
By using this catalogue, you should know that any commercial arrangements you make with suppliers are your own responsibility. The organisations involved in creating this tool bear no responsibility for the arrangements you make by using this tool. If you are unsure what this means or have any concerns, you will need to seek your own legal advice.
This catalogue aims to help organisations to find other organisations who may offer what they cannot source via their existing supplier networks.
No assurance of the suppliers has been carried out. You will need to complete your own assurances and due diligence checks before entering into commercial agreements at your own risk.